Workshop Mon–Fri 8am–5pm UK · 3am–12pm ET · 2am–11am CTQuotes answered the same working day · info@circuitbreakerrepair.co.uk

Schneider Electric · Micrologic

Masterpact NW & NT Repair and Refurbishment

The NW and NT replaced the Masterpact M. They are still widely installed, and the oldest are now past twenty years in service. We strip them, rebuild the mechanism, replace coils, motors and contacts, test the Micrologic trip unit by secondary injection and fly them back to your site.

  • FramesNT06–NT16 · NW08–NW63
  • Trip unitsMicrologic A · P · H
  • Turnaround2–5 workshop days
  • Warranty24 months on overhauls
Schneider Masterpact MTZ with a Micrologic X trip unit, installed in a panel with the front cover off
Masterpact MTZ with Micrologic X, the generation after NWSchneider

Repair, don't replace

Keep the breaker that fits the cell

Masterpact NW and NT are current-generation in the sense that Schneider still supports them, but the newest range is MTZ. When an older NW starts to fail, the conversation can drift toward replacement or an upgrade that changes the cradle, the wiring and the settings.

Most NW and NT faults don't need any of that. A slow-closing mechanism, a dead MCH gear motor, a failed XF closing coil or worn contacts are bench repairs. Where genuine Schneider parts exist, we fit them. The rebuilt breaker goes back into the cradle it came out of, with the same secondary wiring and the same protection settings, and the switchboard is never touched.

That matters more in the US, where Masterpact turns up in European-designed distribution in data centers and in plant that arrived with its own switchboard. A repair keeps that equipment exactly as it was designed and approved. A new breaker on a long lead time keeps the cell empty.

  • No board or cradle modification
  • Protection settings restored as left, and proven by test
  • Fixed price after strip-down
Side view of an air circuit breaker mechanism with rust on the latch plates and springs next to the auxiliary contact blocks
Corrosion on an ACB latch and spring assemblyWorkshop

Common faults

What we see on NW and NT breakers

Slow or failed closing

On any Masterpact past ten years old, hardened mechanism grease is the first suspect. Check the MCH has charged and the XF coil has supply, then look at the mechanism.

Won't charge

MCH gear motor failure, its limit switch, or the charging handle linkage. The motor is replaced and the charge time checked.

Coils and releases

XF closing coils, MX shunt trips and MN undervoltage releases fail with age and heat. Each is tested and replaced, and proven at reduced voltage.

Contact wear

Main and arcing contacts erode on high-operation duty, where the breaker is switched often.

Micrologic faults

Drift, battery and connector faults. Secondary injection tells us whether the trip unit is at fault or the problem is downstream.

Cradle and secondaries

Eroded or overheated cluster contacts, worn racking mechanisms, position switch faults and damaged secondary disconnect blocks.

Air circuit breaker frame on the workshop bench with the primary terminals exposed after strip-down
ACB frame stripped back to the primary terminalsWorkshop

The refurbishment

What a full NW or NT overhaul includes

  • Strip-down to the frame; wear measured against OEM limits before we quote
  • Mechanism dismantled, cleaned, worn parts replaced, re-lubricated, travel and latching verified
  • Main and arcing contact sets renewed; arc chutes cleaned and inspected
  • MCH gear motor and XF, MX and MN coils tested and replaced as needed
  • Auxiliary contacts and secondary disconnect blocks restored
  • Micrologic trip unit tested, repaired or replaced, and set to your protection settings
  • Trip unit upgrades on request, for example Micrologic A to P or H for metering and communications

How it is tested

Secondary injection on long-time, short-time, instantaneous and ground-fault elements as fitted, each result printed beside its tolerance band. Contact resistance per pole, insulation resistance, and mechanical operation. The certificate records the as-left settings against the serial number.

Testing & certificates

Coverage

Masterpact NW and NT models we repair

RangeWhat we cover
Masterpact NTNT06 to NT16, fixed and drawout. Mechanism, MCH motor, XF coil, MN release, auxiliary blocks.
Masterpact NWNW08 to NW63, fixed and drawout. Mechanism, MCH motor, coils, main contacts, secondary disconnects, Micrologic.
Trip unitsMicrologic A, P and H: test, repair, replacement and upgrade
CradlesCluster contacts, racking mechanism, position switches
IEC and UL versionsIEC-frame units and UL-listed versions, including Square D-branded Masterpact. A repair restores the breaker to its original design; we don't re-certify a UL listing.
Other generationsMasterpact M (obsolete) and MTZ, the current range

We repair both: the IEC Masterpact NW and NT found in European-built equipment, and the UL-listed Square D versions installed in US switchgear.

IEC vs UL breakers: what it means for a repair

From your site and back

Turnaround, Express and exchange

Standard

Air freight takes about 3 days each way. Workshop time is 2–5 working days depending on severity, so most units are back in about 8–11 working days, plus customs clearance.

How it works

Express

1–2 days in the workshop. About 7–8 working days door to door, plus clearance.

Exchange units

We hold many tested units in the UK*, flown out the day you report a fault if your model is in stock.

Exchange units

Customs

DAP or DDP, your choice. We prepare the commercial invoice and the repair-and-return paperwork.

Shipping & customs

*Subject to model and rating.

FAQ

Masterpact NW and NT questions

Do you repair Square D Masterpact breakers?

Yes. Square D-branded Masterpact NW and NT units are part of the same family. We repair the breaker to its original design and test it; we don't issue or renew a UL listing.

Do you use genuine Schneider parts?

Where they exist, yes. MCH motors, XF, MX and MN coils, Micrologic units and contact sets for NW and NT are Schneider parts. The certificate lists what was fitted.

Can the breaker be repaired without leaving our site?

Drawout units come out of the cradle and travel to the workshop, where the bench, the test set and the parts are. If you have many units, our engineers can travel to the US and do the work on site. On-site in the US.

Our Micrologic shows a fault but the breaker seems fine. What should we send?

Send the breaker. Injection testing on the bench shows whether the trip unit has drifted or failed, or whether the fault is in the wiring or downstream. You get the answer on the certificate.

Will it come back with our settings?

Yes. Send the settings from your drawings or a photo of the trip unit. The breaker is set to them, tested at them, and the as-left settings are recorded.

Send us the nameplate

A photo of the nameplate and the fault is enough for a first answer. We reply the same working day with a recommendation and a price for diagnosis and freight.

Request a quote